iV. Venting
B. CPVC/PVC Venting (continued)
• PVC vent pipe may not be used
to penetrate combustible or non-
combustible walls unless all following
three conditions are met simultaneously
(see Figure 15):
- The wall penetration is at least 66
in. (1680 mm) from the boiler as
measured along the vent
- The wall is 12 in. (300 mm) thick or
less
- An air space of at least of that shown
in Figure 15 is maintained around
outside of the vent pipe to provide
air circulation
• If above three conditions cannot be
met simultaneously when penetrating
a combustible wall, use CPVC pipe for
wall penetration.
• Size and cut wall opening such that
a minimal clearance is obtained and
to allow easy insertion of vent pipe.
Figure 15: Wall Penetration Clearances
for PVC Vent Pipe
Wall thimbles for CPVC/PVC pipe are
available from U.S. Boiler Company:
P/N’s 102180-01 (3 in.), 102181-01 (4
in.), 103419-01(6 in.).
• Apply sealant between vent pipe and wall
opening to provide weather-tight seal.
Sealant should not restrain the expansion
of the vent pipe.
• Install contractor provided optional trim
plate on wall outside surface to cover
wall opening (see Figure 15).
• Secure trim plate to wall with nails or
screws and seal ID and plate OD or
perimeter with sealant material.
nominal
Pipe
Dia. (in.)
Length of
Straight run
Loop Length
“L”
ft.
m
in.
mm
3
20
6.1
53
1350
30
9.1
65
1650
40
12
75
1900
50
15
84
2130
60
18
92
2340
4
20
6.1
60
1520
30
9.1
74
1880
40
12
85
2159
50
15
95
2413
60
18
104
2642
6
20
6.1
73
1850
30
9.1
90
2290
40
12
103
2620
50
15
116
2950
60
18
127
3230
Table 15: Expansion Loop Lengths
Figure 14: CPVC/PVC Expansion Loop and Offset
Summary of Contents for Alpine ALP500C
Page 48: ...48 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only ...
Page 62: ...62 Figure 40 Ladder Diagram VIII Electrical continued ...
Page 63: ...63 VIII Electrical continued 2 Figure 41 Wiring Connections Diagram ...
Page 72: ...72 IX System Start up continued Figure 48 Operating Instructions ...
Page 124: ...124 XIII Repair Parts continued ...
Page 126: ...126 XIII Repair Parts continued ALP600C ALP700C and ALP800C ALP800C shown ...
Page 130: ...130 XIII Repair Parts continued ...
Page 133: ...133 XIII Repair Parts continued 10A 10B 10C 10D 10G ...
Page 143: ...143 ...
Page 144: ...144 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...