45
Series 90
Inspections and Adjustments
90000255
Checking Continuity of NSS
(Gauges installed in Servo Gauge Ports)
Checking Switch Continuity
Recheck switch continuity to determine whether addi-
tional adjustment of the eccentric plug is necessary.
WARNING
The following procedure may require the vehicle/
machine to be disabled (wheels raised off the ground,
work function disconnected, etc.) while performing
the procedure in order to prevent injury to the
technician and bystanders. Take necessary safety
precautions before moving the vehicle/machine.
S000 007E
1.
Install two 50 bar (or 1000 psi) gauges in each of the
displacement control cylinder gauge ports (M4 and
M5). Attach a continuity checker to the terminals of
the neutral start switch.
2.
Energize the starter circuit, and start the prime
mover.
3.
While operating at normal speed and with the pump
in its “neutral” (zero flow) position, note the pressure
reading on the gauges. This reading should be noted
as the base pressure.
4.
Slowly move the control handle in one direction while
observing the pressure gauges and the continuity
checker. Continuity
must
be broken before the pres-
sure on either gauge increases more than 1 bar
(12 psi) from the base pressure obtained at “neutral.”
5.
Slowly move the control handle in the opposite
direction. Again, continuity must be broken before
the gauge pressure increases more than 1 bar (12 psi)
from base pressure.
6.
Continuity must again be verified when the control is
returned to neutral.
7.
If continuity is not broken at base pressure plus 0 to
1 bar (0 to 12 psi) in either direction, stop the prime
mover and readjust the eccentric plug as described
in the previous section. If the pressure difference is
equal in each direction but greater than 1 bar (12 psi),
loosen the switch locknut and turn the switch clock-
wise 1/12 turn (30°) to increase the sensitivity. Re-
tighten the locknut and recheck pressure differences
and continuity.
8.
After verifying proper control and switch operation,
stop the prime mover. Remove the continuity checker
and pressure gauges. Reinstall the servo pressure
port plugs and reconnect the electrical leads from the
machine starter circuit to the neutral start switch.
Install and adjust, if necessary, the external control
linkage.
Summary of Contents for DPT60
Page 11: ......
Page 12: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 49: ......
Page 59: ...Contents iv 032015 PN 4 ...
Page 180: ...Troubleshooting 70 35 032015 PN 133 ...
Page 192: ...Troubleshooting 70 47 032015 PN 145 ...
Page 210: ...Warranty DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 90 6 032015 PN 163 ...
Page 218: ...Warranty DX EMISSIONS CARB 19 01AUG14 8 8 RG26036 UN 24JUN14 90 14 032015 PN 171 ...
Page 219: ...Warranty 90 15 032015 PN 172 ...
Page 225: ...Engine Registration IBC 2 032015 PN 178 ...
Page 228: ...Engine Registration IBC 5 032015 PN 181 ...
Page 229: ...Engine Registration IBC 6 032015 PN 182 ...
Page 230: ...Axial Piston Pumps and Motors Service Manual Series 90 ...
Page 318: ......
Page 319: ......
Page 320: ......
Page 321: ......
Page 322: ......
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......
Page 327: ......
Page 328: ......
Page 329: ......
Page 330: ......
Page 332: ......
Page 371: ......
Page 373: ...www dexteraxle com OPERATION MAINTENANCE SERVICE MANUAL 600 8 000 lb Axles Related Components ...
Page 455: ...Service Record Date Service Performed Mileage ...
Page 456: ...Service Record Date Service Performed Mileage ...
Page 457: ...Service Record Date Service Performed Mileage ...