8
4.2.1 - Moving the packages
•
Prepare a suitable, delimited area with a level floor or surface for unloading the packages.
•
Prepare the equipment required to handle the package. The lifting and handling equipment (e.g. crane or
lift truck) must be of adequate capacity for the weight and size of the load, taking into account its attac-
hment points and centre of gravity. If required, this information is indicated on the package itself. Harness
heavy packages with chains, belts and steel ropes after checking that they are suitable for the weight of
the load, which is always indicated.
•
When handling the load keep it level to avoid tipping and instability.
4.2.2 - Moving the equipment
All the following operations must be carried out with care and caution and without sudden
movements
.
When lifting, use accessories such as eyebolts, screw clamps, snap hooks, straps, ropes and
hooks etc. which are certified and adequate for the load in question.
The weight of the product to be lifted is given in the Sales Catalogue.
The following pages illustrate in detail the different attachment methods for the various product series, sizes
and configurations described in this Manual.
The most suitable solution for lifting and handling the product in safety is indicated for each.
Symbols:
Type of lifting
Manual
With mechanical equipment
Symbol
M
A
B
Approximate weight
£
15 Kg
>
15 Kg
Instruction
—
Recommended method for po-
sitioning
Recommended
method
for
handling and positioning
Warning
—
The load may be unstable
The load may sway or oscillate
Solution
—
Slide the lifting ring to align it
with the load’s centre of gra-
vity as shown in the diagrams
below
Lock the ropes below the ring
with a cable clamp or similar
device so as to prevent them
sliding, and lift the load
Observe all precautions regar-
ding the handling of loads
Stabilise the moving load by
hand
Observe all precautions regar-
ding the handling of loads
The load must not be allowed to sway by more than 15° in any direction when being lifted.
If swaying exceeds this amount, stop and repeat the lifting operation as instructed.
Summary of Contents for DPT60
Page 11: ......
Page 12: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 49: ......
Page 59: ...Contents iv 032015 PN 4 ...
Page 180: ...Troubleshooting 70 35 032015 PN 133 ...
Page 192: ...Troubleshooting 70 47 032015 PN 145 ...
Page 210: ...Warranty DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 90 6 032015 PN 163 ...
Page 218: ...Warranty DX EMISSIONS CARB 19 01AUG14 8 8 RG26036 UN 24JUN14 90 14 032015 PN 171 ...
Page 219: ...Warranty 90 15 032015 PN 172 ...
Page 225: ...Engine Registration IBC 2 032015 PN 178 ...
Page 228: ...Engine Registration IBC 5 032015 PN 181 ...
Page 229: ...Engine Registration IBC 6 032015 PN 182 ...
Page 230: ...Axial Piston Pumps and Motors Service Manual Series 90 ...
Page 318: ......
Page 319: ......
Page 320: ......
Page 321: ......
Page 322: ......
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......
Page 327: ......
Page 328: ......
Page 329: ......
Page 330: ......
Page 332: ......
Page 371: ......
Page 373: ...www dexteraxle com OPERATION MAINTENANCE SERVICE MANUAL 600 8 000 lb Axles Related Components ...
Page 455: ...Service Record Date Service Performed Mileage ...
Page 456: ...Service Record Date Service Performed Mileage ...
Page 457: ...Service Record Date Service Performed Mileage ...