Installation and operating manual
G961.1 - 03/2012
EN-1
Contents
1
General ............................................................................... 2
1.1
Terms and abbreviations used in this manual .......... 2
1.2
Symbols used in this manual .................................... 3
2
Safety.................................................................................. 3
2.1
General safety instructions ....................................... 3
2.2
Instructions for the operator...................................... 4
2.3
System manufacturer's responsibilities..................... 5
3
Overview............................................................................. 5
3.1
Delivery state ............................................................ 5
3.2
Scope of delivery ...................................................... 5
3.3
Equipment description .............................................. 5
4
Description......................................................................... 7
4.1
Functional description............................................... 7
4.2
Components / Modules............................................. 8
4.3
Technical Specifications ........................................... 8
4.4
Operating fluids......................................................... 8
4.5
Circuit diagram.......................................................... 8
4.6
Operating unit ........................................................... 8
4.7
Safety equipment...................................................... 9
4.8
Anchoring................................................................ 10
4.9
Load limits............................................................... 10
5
Ropes................................................................................ 10
6
Optional accessories....................................................... 11
7
Options ............................................................................. 11
8
Necessary accessories ................................................... 11
9
Installation and commissioning ..................................... 11
9.1
Directives and standards ........................................ 11
9.2
Checks to be undertaken before starting
installation............................................................... 11
9.3
Assembly ................................................................ 12
9.4
Commissioning ....................................................... 15
10
Operation.......................................................................... 16
10.1
Checking before starting work ................................ 16
10.2
Operation ................................................................ 17
10.3
Secondary brake actuation ..................................... 18
10.4
Activation of the secondary brake........................... 18
10.5
Emergency descent ................................................ 18
10.6
Switching off when overloaded ............................... 18
10.7
Deactivation due to rope end reached, loops in
the free reeler or a slack rope ................................. 19
10.8
Measures to be taken after a problem or
safety-stop .............................................................. 19
11
Foreseeable misuse ........................................................ 19
12
Dismantling.......................................................................20
13
Shutting down...................................................................20
13.1
Work breaks.............................................................20
13.2
Temporary shutdown...............................................20
13.3
Permanently decommissioning................................21
14
Transport and storage .....................................................21
14.1
Transport .................................................................21
14.2
Storage ....................................................................21
15
Maintenance work ............................................................21
15.1
Authorized maintenance personnel .........................21
15.2
Mandatory inspections.............................................21
15.3
Reading the running hours counter .........................22
15.4
Care and maintenance ............................................22
15.5
Adjustment...............................................................23
15.6
Ordering spare parts................................................25
16
Disposal and environmental protection.........................25
17
Troubleshooting ...............................................................26
18
EU Declaration of Conformity (Extract)..........................29
DANGER!
Risk of injury caused by falling objects, malfunctions,
incorrect usage and incorrect operation!
Failure to follow these instructions:
can result in severe injuries or death,
can result in damage to the equipment.
–
Read through this operating manual carefully before you
install and commission this machine.
–
Follow the instructions and procedures specified in this
manual in order to ensure safe operation of the equip-
ment.
Summary of Contents for Tirak MWX 1020
Page 5: ...MWX 500 1537 G961 1 03 2012 EN DE FR NL V Fig Abb Fig Afb 1 ...
Page 12: ...MWX 500 1537 EN DE FR NL XII G961 1 03 2012 ...
Page 42: ...Installation and operating manual EN 30 G961 1 03 2012 ...
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ...G961 1 03 2012 105110 EN DE FR NL TRACTEL Greifzug GmbH ...