– 45 –
–5˚C
0’
10’ 15’
27’40”
34’
–7˚C
–20˚C
Operation time
(Minute)
Start of heating operation
*
Outdoor heat e
xchanger temper
ature
C zone
A zone
B zone
–1˚C
–3˚C
OFF
20W
Outdoor temperature To
Winding/Coil
heating amount
Item
7. Winding/Coil
heating control
8. Defrost control
(Only in heating
operation)
Operation flow and applicable data, etc.
When the outdoor temperature is low, the windings/
coils are heated to ensure compressor reliability.
(This function removes frost adhered to the outdoor
heat exchanger.)
The temperature sensor of the outdoor heat ex-
changer (Te sensor) judges the frosting status of the
outdoor heat exchanger and the defrost operation is
performed with 4-way valve reverse defrost system.
∗
The minimum value of Te sensor 10 to 15 minutes
after start of operation is stored in memory as Te0.
Table 1
A zone
B zone
C zone
When Te0 - TE
≥
2.5 continued for 2 minutes in A zone,
defrost operation starts.
When the operation continued for 2 minutes in B zone,
defrost operation starts.
When Te0 - TE
≥
3 continued for 2 minutes in C zone,
defrost operation starts.
Description
Winding/Coil heating is performed when
the following conditions are met.
Condition 1 :
When the discharge sensor temperature
(Td) is less than 30°C.
Condition 2 :
When 2 hours or more have elapsed after
cooling, dry or heating operation stops.
Condition 3 :
When the outdoor sensor temperature (To)
is as shown in the left figure.
The necessity of defrost operation is
detected by the outdoor heat exchanger
temperature. The conditions to detect the
necessity of defrost operation differ in A,
B, or C zone each. (Table 1)
<Defrost operation>
• Defrost operation in A to C zones
1) Stop operation of the compressor for 20
seconds.
2) Invert (OFF) 4-way valve 10 seconds
after stop of the compressor.
3) The outdoor fan stops at the same time
when the compressor stops.
4) When temperature of the indoor heat
exchanger becomes 38°C or lower,
stop the indoor fan.
<Finish of defrost operation>
• Returning conditions from defrost
operation to heating operation
1) Temperature of outdoor heat exchanger
rises to +8°C or higher.
2) Temperature of outdoor heat exchanger
is kept at +5°C or higher for 80 seconds.
3) Defrost operation continues for
15 minutes.
<Returning from defrost operation>
1) Stop operation of the compressor for
approx. 50 seconds.
2) Invert (ON) 4-way valve approx. 40
seconds after stop of the compressor.
3) The outdoor fan starts rotating at the
same time when the compressor starts.