<Installing compressor>
• Install a compressor by following the dismantling procedure in reverse.
• The dismantling process may have loosened compressor leads and
quick
connectors. Prior to installation,
therefore, tighten them a little with a pair of pliers, and verify that they are tight after reconnection.
Notes:
• The tightening torque of the hexagonal bolts, used to mount the compressor,
is 11Nm.
• If oil has been drawn from the accumulator, repair the cut pipe through pinching and brazing.
<Vacuum-pumping>
(Single outdoor unit system)
• Before performing vacuum-pumping, fully open PMV
1 and 4
. If they are closed, the heat exchangers of the
outdoor unit cannot be vacuum-pumped.
• Connect a vacuum pump consecutively to the check joints placed in the liquid and discharge pipes and on the
high-pressure side of the suction pipe, and turn it on.
• Operate the vacuum drying until the vacuum gauge indicates
-100.7kPa (-755
mmHg.
)
<Method to fully open PMV manually>
(1)
Turn on the power switch of the outdoor unit.
(2)
With the Bits 1 and 2 of SW12 set to off, short-circuit the pins of CN30.
(3)
Disconnect the connectors of PMV1 from the I/F P.C. board.
(4)
With the Bits 1 and 2 of SW12 set to off and on, respectively, short-circuit the pins of CN30.
(5)
Disconnect the connector of PMV4 from the I/F P.C. board
(6)
Turn off the power switch of the outdoor unit.
<Refrigerant charging>
• Inject the same amount of refrigerant as the recovered residual refrigerant via the charging port of the liquid-side
service valve.
-- 203 -