7. Putting Relay into Service
The following procedure must be adhered to when putting the relay into service after finishing
commissioning or maintenance tests.
•
Check that all external connections are correct.
•
Check the settings of all measuring elements, timers, scheme switches, recordings and clock
are correct.
In particular, when settings are changed temporarily for testing, be sure to restore them.
•
Clear any unnecessary records on faults, events and disturbances which are recorded during
the tests.
•
Reset the counter figures of autoreclose(*), if necessary. For resetting the count, see Section
4.2.3.4.
(*)
Implemented in models 200s to 500s.
•
Press the VIEW
key and check that no failure message is displayed on the
"Auto-supervision" screen.
•
Check that the green "IN SERVICE" LED is lit and no other LEDs are lit on the front panel.
Whilst the relay is put into service at one terminal by supplying DC power and not yet at the
other terminal, a communication failure will be detected by the automatic monitoring at the
in-service terminal and a red "ALARM" LED is lit. But it will be reset when the relays are put
into service at all terminals.
Summary of Contents for GRL100-101A
Page 223: ... 222 6 F 2 S 0 8 3 5 ...
Page 228: ... 227 6 F 2 S 0 8 3 5 Appendix B Signal List ...
Page 256: ... 255 6 F 2 S 0 8 3 5 Appendix C Variable Timer List ...
Page 258: ... 257 6 F 2 S 0 8 3 5 Appendix D Binary Output Default Setting List ...
Page 269: ... 268 6 F 2 S 0 8 3 5 ...
Page 270: ... 269 6 F 2 S 0 8 3 5 Appendix E Details of Relay Menu ...
Page 279: ... 278 6 F 2 S 0 8 3 5 ...
Page 288: ... 287 6 F 2 S 0 8 3 5 Appendix G Typical External Connection ...
Page 326: ... 325 6 F 2 S 0 8 3 5 Appendix J Return Repair Form ...
Page 330: ... 329 6 F 2 S 0 8 3 5 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 331: ... 330 6 F 2 S 0 8 3 5 ...
Page 332: ... 331 6 F 2 S 0 8 3 5 Appendix K Technical Data ...
Page 343: ... 342 6 F 2 S 0 8 3 5 ...
Page 344: ... 343 6 F 2 S 0 8 3 5 Appendix L Symbols Used in Scheme Logic ...
Page 347: ... 346 6 F 2 S 0 8 3 5 ...
Page 348: ... 347 6 F 2 S 0 8 3 5 Appendix M Multi phase Autoreclose ...
Page 351: ... 350 6 F 2 S 0 8 3 5 ...
Page 352: ... 351 6 F 2 S 0 8 3 5 Appendix N Data Transmission Format ...
Page 358: ... 357 6 F 2 S 0 8 3 5 Appendix O Example of DIF and DIFG Setting ...
Page 364: ... 363 6 F 2 S 0 8 3 5 Appendix Q IEC60870 5 103 Interoperability ...
Page 377: ... 376 6 F 2 S 0 8 3 5 ...
Page 378: ... 377 6 F 2 S 0 8 3 5 Appendix R Failed Module Tracing and Replacement ...
Page 384: ... 383 6 F 2 S 0 8 3 5 Appendix S PLC Setting Sample ...
Page 386: ... 385 6 F 2 S 0 8 3 5 Appendix T Ordering ...
Page 392: ......