Figure 2.10.2.9 shows the energizing control scheme of the two circuit breakers in the
three-phase autoreclose. OVB and UVB are the overvoltage and undervoltage detectors of
busbar voltage VB in Figure 2.10.2.7. OVL1 and UVL1 are likewise the overvoltage and
undervoltage detectors of line voltage VL1.
OVL2 and UVL2 are likewise the overvoltage and undervoltage detectors of line voltage VL2.
VL2 in the center breaker is equivalent to the busbar voltage VB in the busbar breaker.
SYN1 and SYN2 are the synchronism check elements to check synchronization between the two
sides of the busbar and center breakers, respectively. SYN-OP is a voltage and synchronism
check output.
&
SYN2
UVL2
OVL2
UVL1
OVL1
SYN1
UVB
OVB
[VCHK]
"
LB2
"
"
LB1
"
"
DB
"
"
SYN
"
"
OFF
"
TLBD1
0.01 - 1s
TDBL1
0.01 - 1s
0.01 - 10s
0.01 - 1s
0.01 - 1s
0.01 - 10s
≥
1
≥
1
&
&
&
&
&
&
&
1
&
&
TSYN1
≥
1
≥
1
"
ONE
"
"
L1
"
"
L2
"
"
01
"
"
02
"
[ARC-CB]
ARC-SET
+
+
≥
1
&
&
TLBD2
TDBL2
TSYN2
1
&
&
&
SYN
-OP
57
58
60
61
59
159
62
63
64
T3PLL
0.01 - 1s
3PLL
(Three phase live line)
498
Note :
[ARC-CB]
is set to "
ONE
" only when the relay is applied to one-breaker system. Trip and reclose
commands are output only for CB1(bus CB).
Figure 2.10.2.9 Energizing Control Scheme for Two Circuit Breakers
Summary of Contents for GRL100-101A
Page 223: ... 222 6 F 2 S 0 8 3 5 ...
Page 228: ... 227 6 F 2 S 0 8 3 5 Appendix B Signal List ...
Page 256: ... 255 6 F 2 S 0 8 3 5 Appendix C Variable Timer List ...
Page 258: ... 257 6 F 2 S 0 8 3 5 Appendix D Binary Output Default Setting List ...
Page 269: ... 268 6 F 2 S 0 8 3 5 ...
Page 270: ... 269 6 F 2 S 0 8 3 5 Appendix E Details of Relay Menu ...
Page 279: ... 278 6 F 2 S 0 8 3 5 ...
Page 288: ... 287 6 F 2 S 0 8 3 5 Appendix G Typical External Connection ...
Page 326: ... 325 6 F 2 S 0 8 3 5 Appendix J Return Repair Form ...
Page 330: ... 329 6 F 2 S 0 8 3 5 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 331: ... 330 6 F 2 S 0 8 3 5 ...
Page 332: ... 331 6 F 2 S 0 8 3 5 Appendix K Technical Data ...
Page 343: ... 342 6 F 2 S 0 8 3 5 ...
Page 344: ... 343 6 F 2 S 0 8 3 5 Appendix L Symbols Used in Scheme Logic ...
Page 347: ... 346 6 F 2 S 0 8 3 5 ...
Page 348: ... 347 6 F 2 S 0 8 3 5 Appendix M Multi phase Autoreclose ...
Page 351: ... 350 6 F 2 S 0 8 3 5 ...
Page 352: ... 351 6 F 2 S 0 8 3 5 Appendix N Data Transmission Format ...
Page 358: ... 357 6 F 2 S 0 8 3 5 Appendix O Example of DIF and DIFG Setting ...
Page 364: ... 363 6 F 2 S 0 8 3 5 Appendix Q IEC60870 5 103 Interoperability ...
Page 377: ... 376 6 F 2 S 0 8 3 5 ...
Page 378: ... 377 6 F 2 S 0 8 3 5 Appendix R Failed Module Tracing and Replacement ...
Page 384: ... 383 6 F 2 S 0 8 3 5 Appendix S PLC Setting Sample ...
Page 386: ... 385 6 F 2 S 0 8 3 5 Appendix T Ordering ...
Page 392: ......