
5
© 2009 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO205L/255/305/355/455
PREVENTIVE MAINTENANCE (PM)
5 - 25
(1) Push in a new oil seal parallel to the
mounting hole section of the developer frame
or outside of the holder.
* Pay attention to the direction in which the
oil seal is attached. (See figure on right.)
(2) Apply an even coat of grease to the inside of
the oil seal.
• Amount: About two small drops
(3) Wipe off any grease the exudes from the
inside.
Fig. 5-14
Outside
Inside
Developer frame
(Nozzle mixer)
Grease
Oil seal
Summary of Contents for e-studio205L
Page 6: ......
Page 10: ......
Page 336: ...e STUDIO205L 255 305 355 455 2009 TOSHIBA TEC CORPORATION All rights reserved ADJUSTMENT 3 96 ...
Page 671: ......
Page 672: ......