Figure 70
1.
Gearbox
4.
Clutch
2.
Spring
5.
Rubber clutch stop
3.
Spring-loaded idler pulley
6.
PTO drive belt
Replacing the Pump Drive Belt
Service Interval:
Every 50 hours—Check the pump drive
belt.
Note:
Remove the PTO drive belt first if the pump drive
belt needs to be replaced.
1.
Tilt the seat forward, loosen the bolts and remove the
front engine panel.
2.
Remove the PTO drive belt.
3.
Remove the spring from the idler arm (
4.
Install the new belt around the engine and hydro pump
pulley (
5.
Install the PTO drive belt.
6.
Install the spring to the idler arm (
7.
Install the front engine panel.
Figure 71
1.
Clutch
3.
Spring
2.
Pump drive belt
4.
Spring-loaded idler pulley
52
Summary of Contents for Z Master Professional 7000Series 74264TE
Page 67: ...Schematics g012068 Wire Diagram Rev A 67...
Page 68: ...Notes 68...
Page 69: ...Notes 69...
Page 70: ...Notes 70...