Charging the Battery
WARNING
Charging the battery produces gasses that can
explode.
Never smoke near the battery and keep sparks and
flames away from battery.
Important:
Always keep the battery fully charged (1.265
specific gravity). This is especially important to prevent
battery damage when the temperature is below 0°C
(32°F).
1.
Make sure that the filler caps are installed in the battery.
Charge the battery for 10 to 15 minutes at 25 to 30
A or 30 minutes at 10 A.
2.
When the battery is fully charged, unplug the charger
from the electrical outlet, then disconnect the charger
leads from the battery posts (
3.
Install the battery in the machine and connect the
battery cables, refer to
Installing the Battery (page 43)
.
Note:
Do not run the machine with the battery
disconnected, electrical damage may occur.
Figure 55
1.
Positive battery post
3.
Red (+) charger lead
2.
Negative battery post
4.
Black (-) charger lead
Servicing the Fuses
The electrical system is protected by fuses. It requires
no maintenance, however, if a fuse blows check
component/circuit for malfunction or short.
1.
Unlatch the engine hood and raise the engine hood to
gain access to fuse holder (
).
2.
To replace the fuses, pull out on the fuse to remove it.
3.
Install a new fuse (
).
1
3
2
G012492
4
Figure 56
1.
Ignition—30 A (F1)
3.
Clutch—10 A (F3)
2.
Radiator fan—50 A (large,
heavy duty fuse)
4.
Left side fuel tank
44
Summary of Contents for Z Master Professional 7000Series 74264TE
Page 67: ...Schematics g012068 Wire Diagram Rev A 67...
Page 68: ...Notes 68...
Page 69: ...Notes 69...
Page 70: ...Notes 70...