Primary Controller (T1: TEC) (continued)
IMPORTANT
When testing for wire harness continuity at the connector for
the controller, take care to not damage the connector pins with
multimeter test leads. If connector pins are enlarged or damaged
during testing, connector repair may be necessary for proper
machine operation.
g259215
Figure 80
1.
Platform wire harness connector P74
3.
Primary controller (T1: TEC)
2.
Tab
A 50 pin wire platform harness connector is attached to the controller. The
connection terminal function for the controller and the wire harness connector
pins are shown above. If the wire harness connector is removed from the T1:
TEC for any reason, tighten the harness connector screw from
2.8 to 3.2 N·m
(25 to 28 in-lb)
.
Because of the solid state circuitry built into the controller, there is no method to
test the controller directly. A controller may be damaged if an attempt is made to
test it with an electrical test device (e.g. digital multimeter or test light).
Note:
The InfoCenter Display, TECs, and the TDM used on the Outcross 9060
machine are matched for correct machine operation. If any of these components
are replaced for any reason, system software needs to be reloaded (contact an
Authorized Toro Distributor for assistance).
Outcross 9060
Page 6–21
Electrical System: Electrical Component Testing
18234SL Rev B
Summary of Contents for 07511AA
Page 4: ...Reader Comments Page 4 Outcross 9060 18234SL Rev B ...
Page 18: ...Safety Safety and Instructional Decals Page 1 10 Outcross 9060 18234SL Rev B ...
Page 38: ...Specifications and Maintenance Special Tools Page 2 20 Outcross 9060 18234SL Rev B ...
Page 96: ...Engine Service and Repairs Page 4 24 Outcross 9060 18234SL Rev B ...
Page 208: ...Hydraulic System Service and Repairs Page 5 112 Outcross 9060 18234SL Rev B ...
Page 294: ...Electrical System Service and Repairs Page 6 86 Outcross 9060 18234SL Rev B ...
Page 384: ......