Commissioning
EF200F-C
66
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist → See 6.3
• "Post-connection check" checklist → See 7.4
10.2 Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → See 12.1
10.3 Setting the operating language
Factory setting: English or ordered local language
A0029420
Taking the example of the local display
X X X X X X X
X
X
20.50
Operation
Setup
Main menu
0104-1
Display language
English
Español
Français
Display language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Display language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
1.
2.
3.
4.
►
►