Safety Regulations
These Safety Regulations are user hints only and may not be complete!
Ambient temperature:
0 °C up to +45 °C
CAUTION
At temperatures of around or under freezing
point, both condensation and the special
characteristics of the linings (lower friction
values at lower temperatures) can strongly
reduce the braking torque.
The user is responsible for taking respective countermeasures,
e.g. selecting brakes with higher nominal braking torques.
Frequent and extensive temperature fluctuations at high
humidity promote the formation of corrosion, which can lead to
seized linings. The brake function must be inspected both once
attachment has taken place as well as after longer system
downtimes, in order to prevent the drive starting up against
possibly seized linings. The customer is responsible for
providing a protective cover against contamination caused by
construction sites.
Temperatures of over 70 °C on the brake mounting flange can
have a negative effect on the switching times, the braking
torque levels and the noise damping behaviour.
Intended Use
This safety brake is intended for use in electrically operated
elevators and goods elevators according to
EN 81-1:1998+A3:2009.
The safety brake corresponds to DIN EN 81, Part 1 [Sections
9.10.2, 9.11.3, 12.4.2.1 (2nd paragraph), 12.4.2.2, and 12.4.2.5]
in its general design and its mode of operation.
Earthing Connection
The brake is designed for Protection Class I. This protection
covers not only the basic insulation, but also the connection of all
conductive parts to the protective conductor (PE) on the fixed
installation. If the basic insulation fails, no contact voltage will
remain. Please carry out a standardised inspection of the
protective conductor connections to all contactable metal parts!
Class of Insulation F (+155 °C)
The insulation components on the magnetic coils are
manufactured at least to class of insulation F (+155 °C).
Protection
(mechanical) IP10:
Protection against large body surfaces and
large foreign bodies > 50 mm in diameter. No protection against
water.
(electrical) IP54:
Dust-proof and protected against contact as
well as against water spray from any direction.
Brake Storage
Store the brakes in a horizontal position, in dry rooms and
dust and vibration-free.
Relative air humidity < 50 %.
Temperature without major fluctuations within a range
from
–20 ° up to +60 °C.
Do not store in direct sunlight or UV light.
Do not store aggressive, corrosive substances (solvents /
acids / lyes / salts etc.) near to the brakes.
For longer storage of more than 2 years, special measures are
required (please contact the manufacturer).
Handling
Before installation
, the brake must be inspected and found to
be in proper condition.
The brake function must be inspected both
once attachment
has taken place
as well as
after longer system downtimes
, in
order to prevent the drive starting up against possibly seized
linings.
User-implemented Protective Measures:
Please cover moving parts to protect
against injury
through seizure
.
Place a cover on the magnetic part to protect
against injury
through high temperatures
.
Protection circuit:
When using DC-side switching, the coil
must be protected by a suitable protection circuit according
to VDE 0580, which is integrated in
mayr
®
-rectifiers. To
protect the switching contact from consumption when using
DC-side switching, additional protective measures are
necessary (e.g. series connection of switching contacts).
The switching contacts used should have a minimum
contact opening of 3 mm and should be suitable for
inductive load switching. Please make sure on selection that
the rated voltage and the rated operating current are
sufficient. Depending on the application, the switching
contact can also be protected by other protection circuits
(e.g.
mayr
®
-spark quenching unit, half-wave and bridge
rectifiers), although this may of course then alter the
switching times.
Take precautions
against freeze-up of the friction
surfaces
in high humidity and at low temperatures.
Summary of Contents for TW63B
Page 1: ...thyssenkrupp Aufzugswerke Operating manual TW63B drive...
Page 84: ...Part No 9950 000 6021 mit 1024 Imp Part No 9950 000 6021 mit 4096 Imp...
Page 85: ...Part No 00 990 16 03 0 with 1024 pulses...
Page 86: ...Part No 00 990 19 03 0 mit 1024 Imp...
Page 87: ......
Page 103: ...Design for TW63...
Page 104: ......