5
•
Installation
Page 72
UHPLC System
Operating Manual
Make the following connections:
•
Connect a waste line to the system drain port (see
Waste Line to the System Drain Port (Drain Tubing) (
•
When the waste line is set up, test the drain system (see
).
•
Install a detector waste line that connects the flow cell outlet
through the detector waste outlet to the waste. For installation
instructions, see
Installing the Detector Waste Line (
.
TIP
Make sure that you guide the detector waste line through the separate
outlet in the system base, which is located next to the drain port in the
system base.
Figure 27: Funnel and waste outlets on the system base
No.
Description
1
Funnel for system drainage
2
Detector waste outlet
2a
Detector waste line
3
System drain port (hidden behind the elbow connection)
3a
System waste line
•
Connect a waste line to the column compartment drain port. For
instructions, see the
Operating Manual
for the column
compartment.
•
If you have to cut tubing to length, use a tubing cutter. Make sure
that the cut is at a right angle to the length of the tubing and that
the end is free of nicks or burrs.
Summary of Contents for thermoscientific Vanquish UHPLC System
Page 4: ...Contacting Us Page 4 UHPLC System Operating Manual ...
Page 28: ...2 Safety Page 28 UHPLC System Operating Manual ...
Page 34: ...3 System Overview Page 34 UHPLC System Operating Manual ...
Page 38: ...4 Unpacking Page 38 UHPLC System Operating Manual ...
Page 82: ...5 Installation Page 82 UHPLC System Operating Manual ...
Page 100: ...6 Operation Page 100 UHPLC System Operating Manual ...
Page 112: ...7 Maintenance and Service Page 112 UHPLC System Operating Manual ...
Page 128: ...8 Troubleshooting Page 128 UHPLC System Operating Manual ...
Page 132: ...9 Specifications Page 132 UHPLC System Operating Manual ...
Page 144: ...11 Appendix Page 144 UHPLC System Operating Manual ...