Thermo Scientific
S
TERI-CYCLE
i160
/
i250
5-1
5
Operation
Preparing the device
The device must not be released for operation before all major start-up activities (see
) have been completed.
Device check:
Prior to starting operation, the following device components must be checked for their correct function
• Gas hoses must be seated tight on the connecting filter and must be secured using a hose clamp.
• The access port must be capped.
• The pressure compensation opening must be permeable, its insert must be installed in the
workspace.
• The glass door seal must not be damaged.
• The glass door/gas-tight screen measurement opening must be capped.
• The shelf system components must be installed safely.
• The airbox with the HEPA-filter and the air duct must be installed according to the instructions.
Decontaminating the device workspace:
• Run the steri-run decontamination routine (see
“Steri-run decontamination routine“
)
or decontaminate the workspace according to the hygiene regulations set forth by the operator.
Table of Contents
•
•
Summary of Contents for STERI-CYCLE i160
Page 8: ...Table of Contents 6 STERI CYCLE i160 i250 Thermo Scientific ...
Page 12: ...Figures 4 STERI CYCLE i160 i250 Thermo Scientific ...
Page 76: ...5 Operation Starting operation 5 6 STERI CYCLE i160 i250 Thermo Scientific ...
Page 154: ...9 Maintenance Replacing the Door Seal 9 12 STERI CYCLE i160 i250 Thermo Scientific ...
Page 166: ...11 Specifications STERI CYCLE i250 11 10 STERI CYCLE i160 i250 Thermo Scientific ...
Page 196: ...13 Device log 13 2 STERI CYCLE i160 i250 Thermo Scientific ...