Installation Process
Floor mount
Optionally, a system may be mounted to the floor. The floor must be
capable of supporting two times the weight of the instrument. See the
section entitled “Lifting or moving” in the “Safety” chapter earlier in this
manual for lifting and moving precautions. See the section entitled “Floor
mounting” in the installation and regulatory compliance specifications for
your model later in this manual for weight information and anchor and
fastener requirements.
In this configuration, the wall-mount flanges may be removed.
The instrument must be accurately secured within 2 degrees of vertical.
Set screw
Connecting
bolt
Structural member
(weight bearing)
Floor
mount
bracket
Customer supplied
anchors (8)
Customer
supplied
fasteners (8)
All fasteners and brackets are required to safely secure the instrument to the
stand.
Thermo Fisher Scientific
Antaris EX Safety, Installation, and Site Preparation Guide
33