Installation Process
Tolerances of +2 mbarg, +0.8 in H
2
O, and +200 Pa are acceptable.
7.
Turn off the purge gas supply line and then repeat steps 5 and 6
several times to confirm that the relief valve is properly calibrated.
If the valve is properly calibrated continue on to calibrate the
alarm/pressurized indicator.
If it is not properly calibrated, contact technical support.
58
Antaris EX Safety, Installation, and Site Preparation Guide
Thermo Fisher Scientific