Protocol recovery process
Once the conditions causing the fault have been addressed it may be possible to restart a protocol from
a specific protocol step.
Note:
Unless there has been a breach of the closed fluidic system, the reagents will have been retained
in the system and are potentially recoverable.
For manufacturing situations with external run history monitoring, qualified protocols specific to the
point in the program where the triggering event for the shut down occurred, can be initiated. Jump start
from a selected step is described at
Where this isn’t possible, manual intervention may be required to re-locate the fluid into a known bag
and conduct a custom protocol to recover the reagents.
Chapter 7
Safety instructions
Emergency procedures
7
CTS
™
DynaCellect
™
Magnetic Separation System User Guide
157
Summary of Contents for A55867
Page 197: ......