5 First steps
77
23. Postpone the start of measurement if necessary.
24. Click on
[Finish]
to end the hardware startup.
- A message about the successful configuration of the hardware
is displayed.
25. Confirm the message by clicking
[OK]
.
- The new hardware is now ready to be used.
Pos: 79 /TD/Erste Schritte/testo Saveris/06 ****Probelauf/00 Probelauf und Abnahme durchführen @ 0\mod_1189157354187_79.docx @ 4054 @ 3 @ 1
5.12.
Performing the test run
The test run must be performed to ensure proper
operation of the measuring system.
Pos: 80 /TD/Erste Schritte/testo Saveris/06 ****Probelauf/01 Systemverfügbarkeit prüfen @ 0\mod_1189157395875_79.docx @ 4094 @ 3 @ 1
5.12.1.
Checking system availability
Wait for the first connection between the Saveris base
and the probes to check the system availability.
>
Click on
System
in the navigation area.
- The following entries are shown in the tree structure in the data
window:
•
Base