PRISM Field Upgrade Kit Instructions
5
5.
Gently lift the back of the BNC mezzanine board from its connector and
slide it out of the instrument.
Figure 4: Mezzanine board removed
6.
Refer to the following figure and install the screw from the kit (part
number 211-1117-XX) and the spacer post (part number 129-1889-XX)
into the hole closest to the front of the instrument using the following
method:
a.
Insert the screw from the bottom of the board and use a finger to hold
it in place.
b.
Install the spacer post over the screen on the board, while keeping a finger
on head of the screw; tighten the spacer post.
Figure 5: Spacer post installed
Summary of Contents for PRISM MPI-UP PHY-12G
Page 12: ......