(8) Extend the lift cylinder rods so that the
inner channel bottom projects the upper
section of the carriage.
(9) Bring the truck close to the carriage side
so that each roller enters inside of the outer
channel.
(10) Contract the lift cylinder rods to lower the
inner channels gradually. Place each roller
of the carriage into the inner channel.
(11) Engage the chain with the sheave and
connect the chain and anchor through the
joint link.
(12) Adjust the height of the carriage. (See
8.2.2.)
Fig. 8.15
Fig. 8.14
Side Roller
Groove for balls
8. LOAD HANDLING SYSTEM
Summary of Contents for FB-8 Series
Page 2: ......
Page 4: ......
Page 22: ......
Page 26: ......
Page 38: ...NOTE 1 BATTERY 12...
Page 40: ...14 Fig 2 1 Drive Motor Installation DRIVE UNIT DRIVE AXLE DRIVE MOTOR 2 MOTORS...
Page 92: ...NOTE 6 STEERING SYSTEM 66...
Page 106: ...NOTE 6 STEERING SYSTEM 80...
Page 126: ...100 Remove the oil seal from the front cover Fig 7 28 7 HYDRAULIC SYSTEM...
Page 150: ...NOTE 8 LOAD HANDLING SYSTEM 124...
Page 234: ...72 3 TROUBLESHOOTING GUIDE NOTE...
Page 246: ...84 6 ELECTRIC WIRING NOTE...
Page 258: ......
Page 259: ...n m o m Z C F H d o H H M 0 M Z 0 m O m C O R P O R A T I O N T C M...