UpCon remote control
UpCon English Manual (2014-10-07) 61
GPI 2 – Processing Control section
GPI (or SDI metadata) can be used to remote-
control your UpCon’s audio processing feature.
When GPI (or SDI metadata) is used for remote
control, blue “LEDs” on the respective Engine
pages will highlight the affected signal process-
ing parameters.
Enable button
Use this button to enable GPI 2 input for Pro-
cessing Control.
A “GPI” button that controls the same function
can be found on the Remote – Master page in
the Processing section.
Note that SDI metadata can also control audio
processing with the SDI Metadata license loaded
on a UpCon with SDI input/output.
Function parameter
Use the Function parameter to define the param-
eters that should be remote-controlled.
Bypass Format
Format conversion (i.e., DMix and UpCon) can
be bypassed.
GPI can control if the format conversion should
be bypassed as follows:
Format conversion is bypassed when the GPI in-
put is min (0V)
Normal operation (as specified by the Engine
preset) when the GPI input is max (3V3) or not
connected.
On the respective Engine page (Main), the For-
mat Conv. parameter will be greyed out, and a
blue LED indicates that it is being remote con-
trolled.
Engine parameter
Settings: E1, E2, E1+E2
Use the Engine parameter to specify which En-
gines should be remote-controlled.
Status field
The status field is intended for diagnostics dur-
ing the setup of GPI control.
“Active” display
Displayed when the selected Function is active
due to the GPI signal being at min. (0 V) and dif-
ferent from default/unconnected (3V3).
“Idle” display
Displayed when the selected Function is inactive
due to the GPI signal being at max. (3V3) or un-
connected. The device’s behavior is defined by
the currently active Engine preset.
“(N/A)” display
Displayed when the algorithm currently loaded in
the Engine does not support the selected Func-
tion and therefore GPI is not controlling it. The
device’s behavior is defined by the currently ac-
tive Engine preset.
Details regarding GPI 2 signals
GPI 2 is receiving fixed-state, latching signals. A
validation process is performed when receiving
a new GPI voltage. The incoming voltage needs
to be at the new level for 40 ms before the pro-
cessing change is initiated. The processing oc-
curs nearly instantly.
For information on voltage windows and GPI cir-
cuits, see “Appendix 2: UpCon GPI/O page” on
page 101.
Summary of Contents for UpCon
Page 4: ...Important safety instructions UpCon English Manual 2014 10 07 1 Important safety instructions...
Page 8: ...About this manual UpCon English Manual 2014 10 07 5 About this manual...
Page 10: ...Before you get started UpCon English Manual 2014 10 07 7 Before you get started...
Page 12: ...Unpacking and setup UpCon English Manual 2014 10 07 9 Unpacking and setup...
Page 20: ...UpCon An introduction UpCon English Manual 2014 10 07 17 UpCon An introduction...
Page 34: ...Setting up UpCon UpCon English Manual 2014 10 07 31 Setting up UpCon...
Page 40: ...Basic operation UpCon English Manual 2014 10 07 37 Basic operation...
Page 45: ...Accessing UpCon UpCon English Manual 2014 10 07 42 Accessing UpCon...
Page 52: ...Setting up audio and syncing UpCon English Manual 2014 10 07 49 Setting up audio and syncing...
Page 59: ...UpCon remote control UpCon English Manual 2014 10 07 56 UpCon remote control...
Page 77: ...Updating UpCon firmware UpCon English Manual 2014 10 07 74 Updating UpCon firmware...
Page 84: ...Icon Setup UpCon English Manual 2014 10 07 81 Icon Setup...
Page 90: ...The UpCon algorithm UpCon English Manual 2014 10 07 87 The UpCon algorithm...
Page 100: ...The UpCon algorithm UpCon English Manual 2014 10 07 97...
Page 104: ...Appendix 2 UpCon GPI O page UpCon English Manual 2014 10 07 101 Appendix 2 UpCon GPI O page...
Page 107: ...Technical specifications UpCon English Manual 2014 10 07 104 Technical specifications...
Page 114: ...Technical specifications UpCon English Manual 2014 10 07 111...