12
Sun StorEdge 6920 System Getting Started Guide • May 2004
Before You Begin
Before you can begin to install the system, you must complete the following steps:
1. Complete all of the installation preparation tasks described in the Sun StorEdge
6920 System Site Preparation Guide, including:
■
Configuring two separate power drops
■
Ensuring a convenient earth ground
■
Having an external telephone line available for activation of the Sun StorEdge
Remote Response service
Note –
If you have not completed the requirements outlined in the Sun StorEdge
6920 System Site Preparation Guide, do not attempt to install the system. Your
warranty might become void if you perform an improper installation.
Note –
If you do not have a copy of the Sun StorEdge 6920 System Site Preparation
Guide, you can download it from the StorEdge 6920 system documentation web site,
as described in the Preface of this guide.
2. Unpack the system. (See the packing instructions that are attached to the outside
of the shipping container.)
3. Verify the packing list (Appendix D) against the contents of the accessories kit.
4. Use the Information Collection Worksheet (Appendix E) to gather the information
you will need to complete the installation.
Summary of Contents for StorEdge 6920 System
Page 7: ...Contents vii E Information Collection Worksheet 109 Glossary 111 Index 119 ...
Page 8: ...viii Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 12: ...xii Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 18: ...xviii Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 54: ...36 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 92: ...74 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 96: ...78 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 118: ...100 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 136: ...118 Sun StorEdge 6920 System Getting Started Guide May 2004 ...