Appendix B
Remote and Local Power Management
89
8. At the bottom front and bottom back of the base cabinet,
press the AC power
sequencer circuit breakers to On (
FIGURE B-9
).
FIGURE B-9
AC Power Sequencer Control Panel: Power On
On the base cabinet, the Storage Service Processor, Storage Service Processor
accessory tray, network terminal concentrator (NTC), firewall/router, and Ethernet
hub will be powered up because they are connected to the unswitched power
outlets.
Note –
To check the status of the rear power sequencer, open the back door of the
expansion cabinet and look for the three green LEDs.
All components of the system power on in an optimal state.
9. Verify that all the components have only green LEDs illuminated.
It takes several minutes for the diagnostics and initialization process to complete
and the LEDs to reach a steady state. If LEDs other than the green ones are
illuminated, or if LEDs are not illuminated, see “Troubleshooting Tips” on page 99 to
troubleshoot any component that is not powered on.
10. Replace the front trim panel and close the front and back cabinet doors.
SWITCHED OUTLET CONTROL
M
A
I
N
P
O
W
E
R
POWER AVAILABLE
SWITCHED OUTLETS
LOCAL
REMOTE
J15
OUT
OFF
J14
IN
AC power sequencer
circuit breaker
Power On
Summary of Contents for StorEdge 6920 System
Page 7: ...Contents vii E Information Collection Worksheet 109 Glossary 111 Index 119 ...
Page 8: ...viii Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 12: ...xii Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 18: ...xviii Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 54: ...36 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 92: ...74 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 96: ...78 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 118: ...100 Sun StorEdge 6920 System Getting Started Guide May 2004 ...
Page 136: ...118 Sun StorEdge 6920 System Getting Started Guide May 2004 ...