Push the server module into the slot until the server module stops.
Ensure that the pawls on the end of the ejector levers are aligned with the slots in the chassis
sidewalls
Rotate the ejector levels inward toward the center of the server module until they lock into
place.
If the chassis is powered on, the server module comes up to standby power. The green OK LED
on the front panel blinks.
4
5
6
Preparing the Server for Operation
Sun Blade X6275 M2 Server Module Service Manual • March, 2013
36
Summary of Contents for Blade X6275 M2
Page 1: ...Sun Blade X6275 M2 Server Module Service Manual Part No 821 1084 March 2013...
Page 6: ...6...
Page 12: ...12...
Page 18: ...18...
Page 136: ...136...