STOBER
14 | Replacement
02/2019 | ID 442728.05
227
ü
Optional: The SD card is present in the drive controller being replaced; the original project
is stored on the SD card. Or: The control unit of the drive controller being replaced still
works; copy the original project to the SD card before removing the drive controller.
1. Optional: If an AES battery module is present, disconnect the AES from the drive controller.
2. Remove all terminals from the drive controller being uninstalled.
3. Loosen the fastening screws and take the drive controller out of the control cabinet.
4. Optional: Insert the SD card with the original project into the drive controller being installed.
5. Install the new drive controller in the control cabinet.
6. Reattach the terminals.
7. Optional: If an AES battery module was present, attach it to the drive controller with the
associated encoder cable. Tighten the knurled screws so that AES is securely connected to
the drive controller.
8. Optional: In order to be able to identify the SY6 safety module in the FSoE network, you
must transfer its unique address in the FSoE network from the replaced drive controller to
the new drive controller (DIP switches). Further information can be found in the SY6
manual, see the chapter
14.3
Exchanging the supply module
DANGER!
Electrical voltage! Risk of fatal injury due to electric shock!
▪
Always switch off all power supply voltage before working on the devices!
▪
Note the discharge time of the DC link capacitors. You can only determine the absence of
voltage after this time period.
Tool and material
You will need:
§
Tool for loosening and tightening the fastening screws
Requirements and replacement
ü
Supply modules of the same series and same power can be replaced interchangeably.
ü
The hardware and firmware of the supply module being installed are of the same or a
newer version than that of the supply module being uninstalled.
1. Remove all terminals from the supply module being uninstalled.
2. Loosen the fastening screws and take the supply module out of the control cabinet.
3. Install the new supply module in the control cabinet.
4. Reattach the terminals.