Check the tension of double ho-
ses
–
The tension of the double hoses should be
5-10 mm per meter, referred to initial length.
–
Adjust the tension of the hoses to the
specified dimension by sliding them in the
clamps.
Check and adjust mast chains,
lubricate with chain spray
NOTE
After some time in service the lifting chains
stretch and therefore must be checked and
adjusted as necessary on the left and right
sides of the mast.
–
Clean the mast chains.
–
Put the mast vertical.
–
Remove split pin (1).
–
Release locknuts (2).
–
Using nuts (3), adjust the chains to allow a
clearance of 12 mm (1/2 inch) between the
fork heels and the floor.
–
Tighten locknuts (2).
–
Fit new split pin (1).
NOTE
Ensure both chains are adjusted equally.
–
Spray channel surfaces, pulleys and chains
with Linde chain spray.
d3591119
3
2
1
d3591115
Maintenance
5
Load lifting system
246
5001 801 1625 EN - 05/2022 - 03
Summary of Contents for 5410
Page 2: ......
Page 11: ...1 Introduction ...
Page 32: ...Introduction 1 Using working platforms 22 5001 801 1625 EN 05 2022 03 ...
Page 33: ...2 Safety ...
Page 45: ...Safety 2 Residual risks 35 5001 801 1625 EN 05 2022 03 ...
Page 58: ...Safety 2 Medical equipment 48 5001 801 1625 EN 05 2022 03 ...
Page 59: ...3 Overview ...
Page 64: ...Overview 3 Switch panel 54 5001 801 1625 EN 05 2022 03 ...
Page 65: ...4 Operation ...
Page 219: ...5 Maintenance ...
Page 266: ...Maintenance 5 Decommissioning the truck 256 5001 801 1625 EN 05 2022 03 ...
Page 267: ...6 Technical data ...
Page 268: ...Truck dimensions Technical data 6 Truck dimensions 258 5001 801 1625 EN 05 2022 03 ...
Page 282: ...Technical data 6 Overview of type sheets 1200 mm load centre 272 5001 801 1625 EN 05 2022 03 ...
Page 287: ......