Decommissioning the truck
Measures before taking the truck out of operation
If the truck is taken out of operation for over 2
months, it must be parked in a well ventilated,
frost-free, clean and dry room and the follow-
ing measures must be carried out.
–
Thoroughly clean the truck.
–
Fully elevate the fork carriage several
times, tilt the mast forward and back and if
fitted, operate the attachment several times.
–
Lower the forks on a support until the
chains are slack.
–
Check the hydraulic oil level and add oil, if
needed.
–
Add diesel fuel.
–
Apply a thin film of oil or grease on all un-
painted mechanical parts.
–
Lubricate the truck as described in the
maintenance section of this manual.
–
Check the condition and electrolyte level of
the battery. Coat the battery terminals with
non-acidic grease. (Follow the instructions
of the battery manufacturer).
–
Spray all open electrical contacts with a
suitable contact spray.
CAUTION
Danger of tyre deformation.
Block up the truck so that all wheels are clear of the
ground.
NOTE
Do not use plastic foil as this enhances the
formation and collection of condensation wa-
ter.
NOTE
If the vehicle is to be taken out of operation for
a week or more, isolate the battery.
NOTE
If the vehicle is to be taken out of operation for
over 6 months, contact your service partner
for further measures.
Mast and load lifting device removal
DANGER
Danger of damage or injury.
This work must only be carried out by the trained
personnel of your authorised dealer. Do not attempt
to remove the mast or lifting device.
Taking the truck out of service
(note)
If the vehicle is to be taken out of operation
for three months or more, The engine should
be started once a month and fully elevate the
fork carriage several times, Tilt the mast for-
ward and back several times, if the mast with
attachment, operate the attachment several
times .
Maintenance
5
Decommissioning the truck
253
5001 801 1625 EN - 05/2022 - 03
Summary of Contents for 5410
Page 2: ......
Page 11: ...1 Introduction ...
Page 32: ...Introduction 1 Using working platforms 22 5001 801 1625 EN 05 2022 03 ...
Page 33: ...2 Safety ...
Page 45: ...Safety 2 Residual risks 35 5001 801 1625 EN 05 2022 03 ...
Page 58: ...Safety 2 Medical equipment 48 5001 801 1625 EN 05 2022 03 ...
Page 59: ...3 Overview ...
Page 64: ...Overview 3 Switch panel 54 5001 801 1625 EN 05 2022 03 ...
Page 65: ...4 Operation ...
Page 219: ...5 Maintenance ...
Page 266: ...Maintenance 5 Decommissioning the truck 256 5001 801 1625 EN 05 2022 03 ...
Page 267: ...6 Technical data ...
Page 268: ...Truck dimensions Technical data 6 Truck dimensions 258 5001 801 1625 EN 05 2022 03 ...
Page 282: ...Technical data 6 Overview of type sheets 1200 mm load centre 272 5001 801 1625 EN 05 2022 03 ...
Page 287: ......