![Stara HERCULES 5.0 Instruction Manual And Parts Catalog Download Page 7](http://html1.mh-extra.com/html/stara/hercules-5-0/hercules-5-0_instruction-manual-and-parts-catalog_1363240007.webp)
Cut and Send
1st Check-up
250 hours
_____/_____/_____
Date
Nº hours
Stamp and
Dealer’s
Signature
________________
________________
1st CHECK-UP 250 HOURS
Hércules 5.0
Serial Nº :____________________________Nº hours:__________________________
Owner:_____________________________________Date:_________________
City:________________________________________UF:___________________
Dealer:________________________Technician:___________________________
We hereby declare that the referenced machine of this cupon has gone through
the required 250 hours according to all the information contained in the user’s instruction
manual.
Detach this cupon and send to STARA Agricultural Machinery and Implements
Stamp and Dealer’s Signature
Client’s Signature
_________________________
_________________________
Technical Inspection
Motor Diesel MWM
Hydraulic System
( ) Change oil
( ) Change engine filter
( ) Change fuel filter
**********
**********
**********
( ) Conveyor belt tension and conditions.
( ) Disc rotation.
( ) Vane conditions.
**********
**********
**********
Items to be inspected
Items to be replaced.
cut and send