Materials
See below the required materials for connecting Ethernet (S-FTP) cables into SM CIRIUS AO for
traffic, inband management & power:
(see list in paragraph
Error! Reference source not found.
on page
Error! Bookmark not
defined.
)
(see list in paragraphPoE Packageon page
14
)
M20 Cable Gland
Cable holder
The following table shows the M20 Cable gland components in details:
Item
Description
A
Thread adaptor
B
Cable holder
C
Seal
(1)
D
Spacer ring
E
Cap
Summary of Contents for SM Cirius AO
Page 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Page 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Page 6: ...SM Cirius AO Vertical view ...
Page 24: ...Cabling implementation for traffic power ...
Page 26: ...Cabling implementation for outband power ...
Page 29: ...Cabling implementation for traffic outband power ...
Page 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Page 84: ... End of Document ...