Step
Action
3
Insert the four wall wood plugs in the drilled holes in the wall
surface.
4
Insert the four wood screws through the respective holes on the
PoE.
5
Use the tool (item 1) to fully tighten the 4 screws to secure the
mounting device on the wall surface.
6
Connect the grounding cable between PoE& grounding bar.
7
Use the tool (item 1) to reinstall the cover of PoE device.
End of procedure
5 CABLING INSTALLATION
5.1 POE CABLING INSTALLATION
5.1.1 INSTALLING GBE ELECTRICAL FOR TRAFFIC & POWER
Prerequis ites
See below the prerequisites before starting S-FTP cable installation to PoE device:
PoE device should be grounded to the grounding bar.
Availability of 2 x S-FTP Cables terminated to RJ-45 jack.
S-FTP Cable length restrictions, as follows:
o
Due to Electrical ETH limitation the S-FTP cable length between SM CIRIUS AO up to
network equipment should not exceed 100 m.
O
Due to Power limitation the S-FTP cable length between SM CIRIUS AO up to PoE OUT
receptacle should not exceed the following distances:
Num. of
S-FTP
Cables
One
Cable
Two
Cables
(Power in parallel
Voltage supply at PoE input
-40.5 to -60 V
-40.5 to -60 V
-45.5 to -60 V
Freq. Band
8 GHz
50 m
100 m
200(*) m
Freq. Band
11 GHz
75 m
150 m(*)
200(*) m
Freq. Band
13-38 GHz
100 m
200 m(*)
-
Summary of Contents for SM Cirius AO
Page 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Page 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Page 6: ...SM Cirius AO Vertical view ...
Page 24: ...Cabling implementation for traffic power ...
Page 26: ...Cabling implementation for outband power ...
Page 29: ...Cabling implementation for traffic outband power ...
Page 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Page 84: ... End of Document ...