2.2 CABLING OVERVIEW
Introduction
This section shows cabling implementation of SM CIRIUS AO system and described as follows:
Description
Page
GbE Electrical Connection for Traffic& Power
23
FE Electrical Connection for Outband Management& Power
26
GbE Optical Connection for Traffic& FE Connection for Outband
& Power
29
2.2.1 GBE ELECTRICAL CONNECTION FOR TRAFFIC& POWER
Overview
This paragraph shows how to implement the SM CIRIUS AO cabling for passing
traffic
,
inband
management &
power
.
The system
occupies only one GbE electrical interface
for passing traffic, inband
management & power.
SM CIRIUS AO can be powered by PoE device.
It’s mandatory to follow the instructions of this manual for the construction of S-FTP,
Power & Grounding Cables.
Summary of Contents for SM Cirius AO
Page 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Page 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Page 6: ...SM Cirius AO Vertical view ...
Page 24: ...Cabling implementation for traffic power ...
Page 26: ...Cabling implementation for outband power ...
Page 29: ...Cabling implementation for traffic outband power ...
Page 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Page 84: ... End of Document ...