Procedure
(continued)
Step
Action
6
Use the tool (item 7) to tighten the item
(A)
of the gland into the GbE receptacle of
SM CIRIUS AO until ensures complete water tightness.
7
Use the tool (item 7) to tighten the item
(B)
of the gland into item
(A)
, until the
O-ring of item
(B)
ensures complete water tightness.
Summary of Contents for SM Cirius AO
Page 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Page 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Page 6: ...SM Cirius AO Vertical view ...
Page 24: ...Cabling implementation for traffic power ...
Page 26: ...Cabling implementation for outband power ...
Page 29: ...Cabling implementation for traffic outband power ...
Page 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Page 84: ... End of Document ...