0.4
SAFETY PRECAUTIONS
WORKING ON T HE BUILDING’S ROOF
D ur i ng s t o r my w ea t h e r, d o n ot pe r f o rm a ny m ec h a nic al as s e mb li ng o r
antenna beaming work s on the building’s roof.
The met al s t ruc t ure of t owers / mas t s is prone t o light ning
PROPER GROUNDING
N e ve r p o we r up P o E b ox un les s y o u h a ve g r o un d e d b ot h S M C ir ius A O a nd
P oE as des c ribed in t his manual.
There is ris k of equipment failure and/ or elec t ric al s hoc k .
E ns u re t ha t t h e g r ou n di n g s y s t e m me as u r es a n a p pr o p ri at e p at h r es is t a nc e
as s pec ified by loc al regulat i ons .
E ns u re t h at a n a p pr o p ri at e g ro u n di ng t e r mi n al ex is t s at t he p r ox i mit y o f
eac h equipme nt ins t allat ion pos it ion.
PLUGGING / UNPLUGGING T HE S -FT P C ABLE (S) OF SM Cir ius AO
N e ve r pl u g i n o r un pl u g t h e S -F TP c ab l e(s ) o f S M Ci ri us A O w h en P o E box
is p o w e re d o n an d o p er at in g u nl es s y o u ha ve g r ou n d ed b ot h S M Ci ri us A O
and P oE as des c ribed in t his manual.
There is ris k of equipment failure and / or elec t ric al s hoc k .
Summary of Contents for SM Cirius AO
Page 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Page 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Page 6: ...SM Cirius AO Vertical view ...
Page 24: ...Cabling implementation for traffic power ...
Page 26: ...Cabling implementation for outband power ...
Page 29: ...Cabling implementation for traffic outband power ...
Page 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Page 84: ... End of Document ...