3 CABLES PREPARATION
3.1 PREPARING POE GROUNDING CABLE
Prerequisites
See below the prerequisites before starting cable installation:
The grounding bar should be lower in height from the SM CIRIUS AO.
The grounding cable between the PoE and bar should run vertical.
Tool s
See below the required tools for PoE grounding cable preparation & installation (see list in
chapter
Installation Tools
, on page
12
):
Item 1
Item 4
Item 9
NOTE:
PoE Terminal Ring is including inside the device.
The terminal ring for termination to grounding bar
is not supplied.
Materials
See below the required materials for PoE grounding cable preparation &
installation :
(see list in paragraph
PoE device
on page
12
)
Item
A
(see list in paragraph
Optional Cables & Ancillaries
on page
17
)
Item
B
Procedure
To
prepare the PoE grounding cable, follow the steps below:
Step
Action
1
Use the tool (item 1) to unscrew the cover of PoE , as shown
below:
Summary of Contents for SM Cirius AO
Page 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Page 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Page 6: ...SM Cirius AO Vertical view ...
Page 24: ...Cabling implementation for traffic power ...
Page 26: ...Cabling implementation for outband power ...
Page 29: ...Cabling implementation for traffic outband power ...
Page 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Page 84: ... End of Document ...