Press the “Power” icon. The machine will prepare for
field work. This will take 5-30 minutes depending on
water temperature and water level.
The progress bar shows the progress. During this time
the boiler fills with water, and the burner turns on to
heat the water and create steam pressure. The steam
purge and hold mode indicate startup is complete.
Engage the hydraulics and verify that pressure is
detected (the supply pressure icon will change from
orange to grey).
Turn on the tractor.
Confirm whether it is a closed center or open center
hydraulics. This only needs to be selected once. It will
need to be changed if you change tractors.
Open Center
Closed Center
Press then to access the settings page.
Filling
Boiler
Heating Water Building
Pressure
Filling
Boiler
Sight
Glass
Hydraulics Disengaged
Hydraulics Engaged
Upon startup, the screen prompts the operator to do
the daily maintenance. (See maintenance section)