
-
104
-
(29) PA-PID Card Relay 5 Control (Sn-34)
(30) PA-PID Card Relay 6 Control (Sn-35)
(31) PA-PID Card Relay 7 Control (Sn-36)
(32) PA-PID Card Relay 8 Control (Sn-37)
The PA-PID option card application parameters. Please refer to “PA-PID instruction
manual”.
Used to control the pump ON/OFF.
Sn-31 ~ 37=0
:
Relay output invalid.
Sn-31 ~ 37=1
:
Relay output valid.
(33) Parameter Copy (Sn-38)
JNEP-32 LCD digital operator can upload the parameter settings from the digital
operator to inverter and download parameter settings from the inverter to the digital
operator.
The digital operator will check its EEPROM or the inverter's EEPROM under the
following settings.
Sn-38 = 0
:
NO action
Sn-38 = 1
:
Upload data (digital operator
→
inverter). During this period, the LED on
the digital operator will light sequentially in the CW sense.
Sn-38 = 2
:
Download data (inverter
→
digital operator). During this period, the LED
on the digital operator will light sequentially in the CCW sense.
Sn-38 = 3
:
Verification check on digital operator’s EEPROM; during this period the
LED will be switch-on between 2 groups.
Please follow the below steps to implement the action of parameter copy between
different inverters (either upload or download).
Step 1
:
Check the contents of digital operator EEPROM. (Sn-38='03'), then check
the contents of inverter's EEPROM (Sn-38='04'). Make sure that both
EEPROM function properly.
Step 2
:
Download and copy the ' inverter's parameter settings to digital operator
EEPROM (Sn-38=2).
Step 3
:
Upload and copy the parameter settings of digital operator to other inverter's
EEPROM (Sn-38=1)
Summary of Contents for 7300PA series
Page 6: ... 4 PART I INSTALLATION MANUAL ...
Page 35: ... 33 PART II OPERATION MANUAL ...