Cover installation BioX – wood log boiler 15 – 45
20
© Solarbayer GmbH [210205]
17.
18.
19.
Insert the connector X1
in the
display board and look though after
a good cable routing. Insert the
CAN-connection additional
(connection place X3 display board
/ connector X13 control board). Clip
and fix the front cover (2 self-
tapping screws).
Also you can insert the clamp X5
and X2 of the display board and
X12 on the control board.
IMPORTANT!
Look therefor at the electric
documentation!
Tape the cable clip holder to
the sheet metal and attach
connection and sensor
cables that run to the display.
ATTENTION!
Make sure that the cables are
correctly routed! The cables
are not to touch the front
panel of the display!
Fix the side covers on the track
. (3
pieces per side, M5 x 20)
Slack the nuts for the vertical
attitude
, to take the side covers on
the right position. (4 pieces per side)
6
7
8
9
9
8