Cover installation BioX – wood log boiler 15 – 45
© Solarbayer GmbH [210205]
13
7.
8.
8.1
Save the side covers left and right
against moving with a cable strap at
the top of the boiler body.
Take the cable straps in the first
notches to have enough scope for
the installation.
The cable of the door contact switch
have to go upstairs. Fix the switch on
the side covers with two screws. (2
self-tapping screws)
Please, look at the correct position of
the switch (picture at the top).
Attention:
- BioX 15-45: fix the holding
„visible in front“