Cover installation BioX – wood log boiler 15 – 45
12
© Solarbayer GmbH [210205]
4.
5.
6.
Slack the cable channel on the left
and right side, to have more scope
for the mount of the side covers. (2
screws torx each side)
Remove the plate of the display for an
easier mount of the fairing plates (5
screws and 2 cable straps). The
screws are needed at point 10.
Please, lay the plate of the display and
the screws separately.
Clip the side covers left and right
in the track at the bottom of the
boiler body (the srews for that
are in the side covers) but
DON´T
lock the screws.
The cut-outs in the side covers
are for the cable fairlead on the
backside.