Directory
© Solarbayer GmbH [210205]
3
DIRECTORY
Page
1
Safety notes .................................. 5
1.1
Warning notes ..................................... 6
1.2
Operation and maintenance ............... 7
1.2.1
General notes ........................................ 7
1.2.2
Operation ............................................... 7
1.2.3
Maintenance .......................................... 7
2
Cover installation BioX – wood log
boiler 15 – 45 ................................ 8
2.1
Adjust of the doors ........................... 10
3
Installation .................................. 32
3.1
Start-up ............................................... 32
3.2
Important
tips
for
heating
contractors ......................................... 32
3.3
Range of application and water
connection ......................................... 32
3.3.1
Expansion tank – safety valve ............. 32
3.3.2
Excess temperature drain ................... 32
3.4
Return flow boost .............................. 33
3.5
Installation, boiler room and supply air
............................................................. 33
3.6
Installation location........................... 33
3.7
Transport tot he boiler room ............ 33
3.7.1
Checks after transport ......................... 33
3.8
Chimney ............................................. 34
3.8.1
Characteristics of the chimney ............ 34
3.8.2
Correct connection of the boiler to the
chimney ............................................... 34
3.8.3
Correct dimensioning of the chimney
(according to EN 13384) ..................... 34
4
Overview safety equipment ....... 36
5
Technical data and sizes ........... 37
5.1
Technical data .................................... 37
5.2
Dimensions and connections .......... 39
6
Fuels ............................................ 40
6.1
Suitable fuels ..................................... 40
6.2
Unsuitable fuels ................................. 41
7
Start-up with cold system .......... 41
8
Handling of the heating system 42
8.1
Sealing the boiler ............................... 42
8.2
Operation with low performance
decrease ............................................. 42
8.3
Overheating of the boiler .................. 42
8.4
Sweating of the boiler ....................... 42
8.5
Taking out of operation ..................... 42
9
Boiler operation .......................... 43
9.1
Preparation for heating up................ 43
9.2
Heating up .......................................... 43
9.3
Energy absorption capacity / STL ... 44
9.4
System ................................................ 45
9.5
Re-heating .......................................... 46
10
Maintenance and cleaning ......... 46
10.1
De-ashing and cleaning general ...... 46
10.2
Cleaning of the heat recovery areas
(manual) .............................................. 46
10.3
Cleaning
of
the
combustion
chamber .............................................. 46
10.4
Cleaning the flue pipe ....................... 47
10.5
Filling shaft – Filling shaft door ....... 47
10.6
Checking the heat exchanger .......... 47