6. OPERATING PROCEDURES
6.3. SHUTDOWN
Shutdown interrupts the power supply to the load and causes the UPS and battery charger to stop.
• Enter menu
MAIN MENU > COMMANDS > UPS PROCEDURES
• Select
Automatic Stop Procedure
and press
ENTER
• Wait approx. 2 minutes for the UPS to shut down (controlled shutdown of any server connected to the LAN can be managed by
proper shutdown software).
• Carry out the operations indicated on the display.
This operation cannot be aborted.
In the case of UPSs connected in parallel, the Automatic Stop Procedure is available on UNIT MENU, and only
concerns the unit from which the command has been activated: it does not affect the behaviour of the other units.
In order to switch off the whole system, repeat the automatic stop procedure on each UPS unit.
6.4. SWITCHING ONTO MAINTENANCE BYPASS
Switching onto maintenance bypass creates a direct connection between the UPS input and output, completely excluding the
equipment control part. This operation is performed in the event of standard maintenance on the equipment, so as not to remove
the power supply from the load, or in the event of a serious failure while waiting for the equipment to be repaired.
• Enter menu
MAIN MENU > COMMANDS > UPS PROCEDURES
• Select
ON MAINT. BYPASS
and press
ENTER
• Carry out the operations indicated on the display.
If there is an external manual bypass, carry out the procedure described above before activating this switch.
In the case of UPSs connected in parallel, the maintenence bypass procedure is available in MAIN MENU (SYSTEM)
and affects the whole system.
6.5. SWITCHING ON FROM MAINTENANCE BYPASS
• Put switch
Q1
into position
1
(mains ON).
• Wait for the display to switch on.
• Enter menu
MAIN MENU > COMMANDS > UPS PROCEDURES
• Select
Automatic Start Procedure
and press
ENTER
.
• Carry out the operations indicated on the display.
If there is an external manual bypass not monitored from the UPS or the parallel system put the switch to position
OFF to avoid overlap of mains and inverter.
6.6. EXTENDED OUT OF SERVICE
If the UPS is deactivated for some time, the batteries must be recharged regularly. They should be recharged every three months.
• Connect the mains and auxiliary mains to the UPS.
• Put switch
Q1
into position
1
(mains ON).
• Wait for the display to switch on.
• Close the external battery breaker/fuses.
• Put or keep switches
Q3
(output) and
Q5
(maintenance bypass) in position
0
.
• The battery must be charged for at least ten hours.
• Once ten hours have elapsed, open the external battery breaker/fuses.
• Put switch
Q1
into position
0
(mains OFF).
Summary of Contents for Green Power 2.0 60
Page 23: ...23 Green Power 2 0 60 80 kVA Ref IOMMASGPXX06 EN 06 ENGLISH 5 HUMAN MACHINE INTERFACE 3...
Page 42: ......
Page 43: ...Green Power 2 0 P a r a l l e l C o n f i g u r a t i o n...
Page 49: ......
Page 50: ......
Page 51: ......