Service and maintenance
5.2 Commissioning after a long storage time
Power Module PM240-2
Hardware Installation Manual, 01/2020, A5E33294624B AL
69
5.2
Commissioning after a long storage time
If the converter was not operational for a longer period of time, it is possible that you must
form the DC-link capacitors before switching on.
Form the DC-link capacitors in the following cases:
●
If the converter was not operational for longer than one year.
●
If the date of manufacture of the converter was more than one year ago when
commissioning the drive system for the first time. The date of manufacture is coded in the
serial number (see the next paragraph).
You form the DC-link capacitors by connecting power to the converters as shown below.
Figure 5-1
Forming the DC-link capacitors
Data of manufacture of the converter
The date of manufacture of the converter is coded in positions 3 - 6 of the serial number.
Figure 5-2
Data of manufacture in the serial number (example, April 21, 2013)
Summary of Contents for SINAMICS G120
Page 1: ...Power Module PM240 2 ...
Page 2: ......
Page 6: ...Preface Power Module PM240 2 4 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Page 10: ...Table of contents Power Module PM240 2 8 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Page 118: ...Spare parts Power Module PM240 2 116 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Page 175: ......
Page 176: ......