
Operation
194/214
Revision 06 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • 864-5091.9
42.4
Switching operations in top-mounted bus sectionalizer, system 1
Coupling busbar sections (system 1)
1
Initial situation
2
➭ Push the left-hand control gate to the left.
3
➭ Switch the three-position disconnector to CLOSED position (insert
the operating lever for the DISCONNECTING function and turn 180°
clockwise).
4
➭ Remove the operating lever for the DISCONNECTING function.
The left-hand control gate returns to its initial position.
5
➭ Push the right-hand control gate to the left.
6
➭ Switch the three-position disconnector to CLOSED position (insert the
operating lever for the DISCONNECTING function and turn 180°
clockwise).
7
➭ Remove the operating lever for the DISCONNECTING function.
The right-hand control gate returns to its initial position.