
Installation
76/214
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
Panel links for
panel groups delivered by
the factory
The frames of the panel groups pre-assembled at the factory are bolted together at the panel
joints at the front ① and rear ② with one panel link each.
Panel links for panel
groups to be assembled
➭ Align adjacent connecting plates at the frames. The holes must be in line.
Fig. 67:
Panel links for panel groups
assembled at the factory
①
Large panel link (front)
②
Large panel link (rear)
Fig. 68:
Panel links for panel groups
to be assembled on site
①
Small panel links (front)
②
Large panel link (rear)
Fig. 69:
Bolted joint at the frame,
executed on site (front view)
①
Small panel link, top
②
Rear part of the frame
at the panel to be lined up
③
Front part of the frame
at the panel to be lined up
④
Large panel link
⑤
Front support
⑥
Small panel link, bottom
⑦
Front part of the frame
at the fixed-mounted panel