Operation
186/214
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
Earthing the feeder
De-earthing the feeder
1
Initial situation
2
➭ Push the control gate to the right.
3
➭ Switch the three-position disconnector to EARTHED
position (insert the operating lever for the READY-
TO-EARTH function and turn 180° clockwise).
4
➭ Remove the operating lever for the READY-TO-
EARTH function.
The control gate returns to its initial position.
1
Initial situation
2
➭ Push the control gate to the right.
3
➭ Switch the three-position disconnector from
EARTHED to OPEN position (insert the operating
lever for the READY-TO-EARTH function and turn
180° counter-clockwise).
4
➭ Remove the operating lever for the READY-TO-
EARTH function.
The control gate returns to its initial position.