COMMISSIONING
128
8017768/12AX/2019-05-31|SICK
O P E R A T I N G I N S T R U C T I O N S | TIC
Subject to change without notice
6.7
Running the configuration
You can now complete the configuration of the measurement site and run it in the TEMS
Recorder straight away. The system components are automatically calibrated when
starting the configuration.
Start configuration
▸
Click the
Start site configuration
icon.
A progress bar is displayed to visualize the start of configuration.
Calibration
Following this, the mounting height of the system components will be detected
automatically by measuring the distance from the ground (Floor Finding). During the Floor
Finding process, each 2D LiDAR sensor collects a certain amount of measurement data
from the road in the measuring range. This process may take a few seconds. It will be
tracked in the visualization.
▸
If the configuration cannot be started, we recommend that you first check the voltage
supply for the system components (to make sure it is correct), the network connectivity,
and the IP addresses.
▸
Also make sure that the system components have been mounted according to the
specifications (see chapter
▸
Check the position and alignment of the system components in TEMS Manager. The
position and alignment must match the actual conditions.