This chapter contains an explanation of the operation check for the
simple system in the
figure
below.
Detector
Column oven
Manual injector
(7725)
Pump
Reservoir
box
D
Option
box
LC- 1
O A D
R I D - 1 O A
Helium gas
Manual
Column
injector
Reservoir
1.
Preparation
2.
Connection
3.
Operation
Prepare
required
reservoirs.
Prepare mobile phase. (Refer to section
4.)
Connect the input cable of the Chromatopac to the
INTEGRATOR
output terminal
of this equipment
using
the
signal cable supplied to
this equipment through the
block supplied to the Chromatopac.
Turn ON the system power.
Open
the
valve of the pump
and
purge the entire flow
line to prime the pump. Suck out about
using the
syringe.
Close the
drain
valve and operate the pump at 1
Verify
that pump pressure
is stable
and
mobile phase is flowing
the outlet.
Set
the temperature of
to
Set parameter
RANGE
of
to
2.
(AUX output
range becomes
x
Set the Chromatopac
to
4.
(Plot full scale
of the
Chromatopac becomes equivalent to
16
x
6-2
Summary of Contents for RID-10A
Page 19: ...Chapter 2 Parts List c v 3 2 1 Parts and Accessories 2 2 1CONTENTS 1 2 1 RID 1OA...
Page 63: ...c Chapter 6 Initial Performance Test 1 6 1 System Performance Check 6 2 6 1 RID 1OA...
Page 102: ...Chapter I 1 Specifications 11 1 RID 10A Specifications 11 2 I CONTENTS I 11 1 RID 1OA...
Page 105: ...Parts I 12 1 Consumablesand Repair Parts 12 2 12 2 Optional Parts 12 4 12 1 RID 1OA...
Page 109: ...Chapter 13 Reference I i L 13 1 Solvent Characteristics 13 2 I 13 1 RID 1OA...