PRODUCT OPERATION & MAINTENANCE PROCEDURE
Model 0101
4
POP-0011– Rev. 5
INSTALLATION AND SET-UP
1.
After removing the crusher from its packaging, place the system on a strong and sturdy surface.
(Please
note: All packaging should be retained by the customer for (30) days from the time of receipt. In the
event that this unit needs to be returned for replacement or repair this packaging will be required to
do so. Should the packaging have been discarded before the (30) day requested period, packaging
costs will be incurred by the customer).
2.
Be certain that all paperwork and any loose items that may have been shipped with the crusher have
been removed from the packaging and from within the Crushing Chamber as well.
3.
IMPORTANT:
To avoid hydraulic fluid from leaking from the reservoir tank during shipment; this
Crusher was shipped with a "Red" Shipping Plug installed. Prior to operating this Crusher the "Red"
Shipping Plug must be replaced with the "Black" Breather Plug. (See plug pictures below.)
DO NOT
OPERATE THE CRUSHER WITH THE "RED" SHIPPING PLUG INSTALLED IN THE
RESERVOIR!
NOTE:
The "Red" Shipping Plug must be retained by the customer; this item
will be required to prevent hydraulic fluid from leaking from the reservoir tank in the event the
unit needs to be moved to another location or shipped in any way.
4.
To replace the "Red" Shipping Plug with the "Black" Breather Plug; begin by locating the Back Panel on
the Crusher.
THE CRUSHER SHOULD NOT BE PLUGGED INTO AN ELECTRICAL
OUTLET WHEN COMPLETING THIS PROCESS.
The Back Panel is secured by (6) Phillips Head
Screws. Begin by removing these screws and slide the Back Panel next to the system. Caution: The
power cord is connected to the Back Panel. DO NOT pull too hard on the panel when removing.
Simply lean the panel on the side of the Crusher. (See picture below)
“RED”
Shipping Plug
“BLACK”
Breather Plug